Metal Frames for Raising Storage Cases Above Floor Surfaces
Purpose
Extensive series of storage units often are used to house natural history collections. Typically, these units rest on floor surfaces, or on wooden frames if there is a need for leveling floor irregularities. It is not unusual for organic and inorganic materials to accumulate between and under these storage units, providing refuge and nutrients for insect pests. By positioning storage units above floor surfaces, debris can be removed with periodic house-keeping measures. In turn, the absence of debris accumulation can be more effective in solving pest problems than the use of toxic chemicals. Raising storage cases above floor surfaces can provide other benefits, such as protection from floods.
Author(s)
Stephen L. Williams
Natural Science Research Lab.
Museum of Texas Tech Univ.
4th Street and Indiana Avenue
Lubbock, TX 79409 USA
Tel (806) 742-2486
Fax (806) 742-1136
Illustrations:
Stephen L. Williams
Publication: 1992
Description

Materials Tools Supplies
- Aluminum frame supports (legs)
- Flat washers, 3/8in
- Hacksaw
- Heavy hammer
- Hex head cap screws, 3/8in x 1in
- Level
- Lever or crowbar
- Nuts, hexagonal
- Socket wrench
- Steel channel, U-shaped
- Tape measure
Construction
- Obtain the parts of the frame and position them in the work area.
- With channel slots up, bolt the head of the leg assembly to the connecting channels (Fig. 2).
Figure 2. Enlargement of leg parts.
- Assemble the periphery of the frame first, followed by the inter-connecting parts.
- After the frame is assembled, flip it over and place it in the desired position on the floor.
- Starting with the corners, lift the frame and insert the assembled base and stud of the leg into the head that is bolted to the frame. It may be helpful to pre-set the adjustable nut on the stud at a specified distance (for example, 2cm) from the top, particularly for the corner and middle legs.
- After all of the legs are placed under the frame, position the entire structure in its permanent location on the floor (Fig. 3).
Figure 3. Fully assembled frame ready for use.
- With the frame in its desired position, level the entire structure using the adjustments on the legs. It may be more effective to level the ends first, followed by the primary channels. Because longer sections of the channel will tend to sag, it will be necessary to provide appropriate support about every two meters before any effort at leveling the entire frame is attempted.
- After the sides of the frame are leveled, level the interconnecting metal channel.
- After assembly, positioning, and leveling are completed, place the cases on the frame. Empty cases before placement.
- As cases are installed, make minor adjustments of the legs to insure the best position for the cases.
- Check alignment of doors and space between the cases. When adjustments are necessary it is more effective to use a lever to raise the loaded frame and then manually adjust the level of the nut that controls the frame height.